Powered by Smartsupp

2024 PARIS OLYMPICS’ AQUATIC CENTER, PARIS FRANCE

The proposed design of the Aquatic Centre for the Paris 2024 Olympics has been revealed by MAD Architects. Envisioned to be the sports facility...

VISITOR REGISTRATION FORM

Shalimar High Rise, Lucknow – Landmark Structure

Shalimar’s new Edifice is a composite steel structure high rise standing approximately 30 meters in height and is the state-of-the-art building in Lucknow. The...
video

RAJA AEDERI – The LEGEND of Steel Construction

Indian Steel Construction Council along with Steel Structures and Metal Buildings Magazine, after thorough deliberation with the SCS Expert Committee 2022 brought a novel...
video

A panel discussion on “Making Steel Fabrication Industry Profitable”

The panelists of the session were: P V Mohan, Director – Commercial, Kirby Buildings Systems & Structures India Pvt Ltd K Saravanan, Senior Vice...
video

(WOW) Way of working

Pre-engineered Buildings - (WOW) Way of working : Joseph Rozario
video

Steel Day Keynote Address 1

Steel Day Keynote Address 1 - Harssha Shetty
video

Reimaging Luxury

Reimaging Luxury through Prefab Technology - Amod Barve
video

Application & Advantages of TATA Structura

Application & Advantages of TATA Structura in Large-span Sheds & Industrial Building -Amit Kumar Santra

Brigade Tech Garden B-4, Bengaluru

BRIGADE TECH GARDEN-B4 at Brookfield’s, Bengaluru - has 2 levels of RCC floor plate to suit the circumference of the Dome and envelope the...

Recent Posts